The Permian Basin is located in West Texas and the southeastern part of New Mexico.  It reaches from just south of Lubbock, Texas, to just south of Midland and Odessa, Texas, extending westward into the southeastern part of New Mexico.  It stretches 250 miles wide and 300 miles long.  It is divided between the Delaware Basin on the west, the Central Basin Platform in the middle, and the Midland Basin to the east.

 

 

AREA OF OPERATIONS

BACKGROUND

Jurassic SWD’s founder and Managing Member, Dennis Kittler saw an incredible business opportunity while drilling an offshore oil well in the middle of Galveston Bay, Texas (Gulf of Mexico) 2016.  All over the news media was being announced the discovery of more than 50 billion barrels of newly proven crude oil  and 16 trillion cubic feet of natural gas from the multiple stacked Permian Basin reservoir shales in West Texas according to an assessment by the U.S. Geological Survey.  In just a few short years, the Permian Basin has become one of the most prolific oil and gas producing regions in the USA.  Oil companies both large and small have been racing to acquire mineral leases throughout this vast west Texas oil-bearing discovery was the result of today’s state-of-the-art horizontal drilling extraction techniques and 3D seismic technology.  One newspaper article discussed how these Permian Basin oil wells require large hydraulic fracturing procedures to unlock the oil from the shale formations.  Each of these “fracing” procedures require massive amounts of fresh water mixed with chemicals and proppants that are then pumped into the oil bearing shale formations under very high pressures.  As much as 300,000 to 1,000,000 barrels of fresh water are required to drill and frac each horizontal well.  This fluid ultimately will return to the surface as the well is produced.  This fluid is required by law to be disposed of under strict rules by the EPA under the statutory law of the Texas Water Code and enforced by the Texas Railroad Commission.  In addition, the typical Permian Basin oil well initially produces an average of 650 to 1,000 barrels of oil per day along with thousands of barrels of produced formation saltwater per day that also must be properly disposed of by law.  The ratio of one (1) barrel of oil to ten (10) barrels of saltwater or more created an enormous challenge to operators.  Within the past 48 months, companies like Exxon Mobil, Occidental Petroleum, Chevron, EOG Resources, Apache Corporation, Concho Resources, Shell Oil, Anadarko E&P, and many large and small independent oil operators are involved in drilling ultimately several thousand new oil wells in the Permian Basin. EOG Resources recently completed an oil well in the Delaware Basin producing 5000 barrels of oil per day. Recently, the Texas State Highway Department reported more than 2500 Saltwater Tanker and Vacuum Trucks were running daily on the highways and county roads within the West Texas Permian Basin. 

BUSINESS OPPORTUNITY IS CREATED

As a result of this Permian Basin “oil boom”, JSWD decided that drilling a highly in demand saltwater disposal well along with a state-of-the-art injection disposal surface facility for produced formation saltwater and other completion fluids had a significantly less risk factor than drilling an oil or gas well!  Economically, a state-of-the-art saltwater disposal facility design (including drilling a SWD well) costs approximately $6 to $8 million.  The cost of drilling an average Permian Basin horizontal oil well could exceed $9 to $12 million or more.  After spending several months researching nearly every aspect of the incredible surge of oil companies acquiring mineral leases and budgeting their commitment to drilling a significant number of wells allowed this unique business opportunity to be taken seriously on behalf of Jurassic SWD’s network of qualified prospective business partners.

CLASS II SALTWATER DISPOSAL FACILITY DURING CONSTRUCTION AND COMPLETION OF FACILITY

The photos below were taken of a current Class II Saltwater Water Disposal Facility  while under construction and then during the first day of Operations in the Permian Basin (Loving County) in west Texas. Within 10 days, this new Facility was injecting 20,000 to 25,000 barrels of saltwater down its saltwater disposal well. At times, the Operator had to turn away tanker and vacuum trucks. In less than 24 months, the SWD Operator was able to negotiate with an active Oil Operator to build a 10” pipeline bringing up to 10,000 barrels per day of additional produced saltwater to this saltwater facility.  The goal of every SWD Operator is to convince Oil Operators to build a  saltwater pipeline to their SWD facility for injection or recycling.

 

 

THE PERMIAN BASIN

The Permian Basin is located in West Texas and the southeastern part of New Mexico.  It reaches from just south of Lubbock, Texas, to just south of Midland and Odessa, Texas, extending westward into the southeastern part of New Mexico.  It stretches 250 miles wide and 300 miles long.  It is divided between the Delaware Basin on the west, the Central Basin Platform in the middle, and the Midland Basin to the east.

MAP OF THE PERMIAN BASIN 

(TEXAS AND NEW MEXICO)

 

 

Thank you for contacting Jurassic SWD, LLC ("JSWD").  JSWD management understands the importance of each and every new entity or individual who contacts us.  These are opportunities which could develop into a mutually beneficial relationship for years to come.  Therefore, it is important that you complete the form below with accurate contact information. 